Current projects are projects that the city is working on that are in some stage of design phase and possibly even the beginning of construction. The Web sites are not updated as frequently, as the design process from beginning to being ready for construction can take anywhere from two to 10 years, and sometimes more. This can include any of the following stages of design: preliminary design, final design, land acquisition, bidding of the plans and beginning coordination of construction activities.

Click here for a list of Construction Alerts.


111th Street Improvement
The City of Naperville plans to improve 111th Street between Route 59 and Perth Drive.
 
2009 Bituminous Patching Program
The city awarded the project to Geneva Construction. Work is slated to begin in late April/early May 2009.
 
5th Avenue Study 2008
The City of Naperville is conducting the 5th Avenue Study to evaluate land use, commuter parking, and multi-modal circulation (i.e., bicycle, pedestrian and public transit circulation) in the vicinity of the downtown Naperville train station.
 
75th and Olympus Feasibility Study
The City of Naperville is conducting this feasibility study to evaluate the potential for a grade separated pedestrian crossing at the intersection of 75th Street and Olympus Drive. 
 
75th and Washington Improvements
The City of Naperville, in partnership with DuPage County, will begin construction to improve the intersection at 75th and Washington in November 2008.
 
95th Street Extension Project
This project is joint effort of Will County, Naperville, and Bolingbrook and is meant to meet the transportation needs of these communities in the project area by providing a 1.1 mile reduction in travel distance per trip.
 
Accessible Pedestrian Signals
In late 2008, Accessible Pedestrian Signals were installed at the intersection of Chicago Avenue and Ellsworth Street, near the North Central College campus.
 
Bicycle Implementation Plan
The City of Naperville Bicycle Implementation Plan guides the establishment of new bicycle facilities throughout the city.
 
Book Road Extension Project
The City of Naperville plans to extend Book Road south of 111th Street to 117th Street. 
 
Central Park Master Plan
The purpose of the Central Park Master Plan is to ensure that improvements to the park are coordinated and that additional improvement opportunities are considered to effectively address the short and long-term needs of Central Park.
 
Circulator Transit Study
The purpose of the Naperville Circulator Study is to examine the potential for the successful implementation of a local transit service within the City of Naperville.
 
Downtown Parking Initiatives
The Downtown Parking Initiatives will review site and financing options for the construction of additional parking in the downtown area.
 
Downtown Parking Management Study
A study is being conducted to examine all opportunities that could lead to traffic and parking system improvements in the downtown to meet the needs of all users.
 
DuPage River Trail, Segment 4
The DuPage River Trail is a multi-use paved trail designed for non-motorized public use.
 
East Highlands Area Roadway Improvements
The goal of this project is to improve the streets in the East Highlands neighborhood by upgrading the existing roadways to current city standards.
 
East Sector Comprehensive Plan Update
The East Sector is Naperville’s largest planning area, encompassing over 27 square miles of land. Although most of the East Sector will retain its established character into the future, some areas may be subject to future development or redevelopment. 
 
Illinois Route 59 Expansion
A study was commissioned in 2003 to analyze the current traffic situation, consider various options to enhance safety and improve traffic flow and design a safe and cost-effective plan to address these issues for Route 59 along the western border of Naperville.
 
Illinois Route 59 Sidewalk
To further promote pedestrian mobility and connect existing segments of sidewalk, new sidewalk will be installed on both sides of IL Route 59 from 87th Street to the Naperville city limits south of 111th Street.
 
Jefferson Avenue Bridge Project
The Jefferson Avenue Bridge is scheduled for replacement in Winter/Spring 2010.
 
Joseph Naper Homestead
On April 13, 2006, the City of Naperville purchased the original Joseph Naper Homestead at 338 W. Jefferson Avenue and has conducted two on-site archeological digs managed by the Naperville Heritage Society revealing foundation elements of four different structures that once stood on the site, as well as more than 25,000 artifacts.
 
North Aurora Road Improvement
The purpose of this project is to conduct a preliminary engineering study for widening North Aurora Road from Frontenac Road to Weston Ridge Drive from three lanes to five lanes.
 
North Aurora Road Underpass
The purpose of this project is to conduct a preliminary engineering study for the widening and replacement of the North Aurora Road Underpass at the Elgin, Joliet, & Eastern (EJ&E)/ Burlington Northern Santa Fe Railroad (BNSF) railroad tracks.
 
Ogden Avenue Corridor Enhancement Initiative
The City of Naperville, in cooperation with the Naperville Development Partnership, is conducting a study for the possible enhancement of Ogden Avenue between Washington Street and Naper Boulevard.
 
Parking Guidance Systems
The City of Naperville is installing Parking Guidance Systems at the Central Parking Facility and the Van Buren Parking Deck to monitor the number of vehicles entering and exiting parking structures.
 
Plank Road Study
The Plank Road Study will focus on land use, primarily addressing the topics of redevelopment and infill within the study area.
 
Ranchview Drive Electric Utility Infrastructure
Ranchview Drive Electric Utility Infrastructure Work to Begin in SpringConstruction related electrical infrastructure work in scheduled to take place on Ranchview Drive between Wehrli Road and 75th Street beginning the week of
 
Sanitary Sewer Interceptor Cleaning
The Department of Public Utilities has hired a contractor to clean approximately 15,693 feet of 42 inch sanitary sewer interceptor.
 
Sanitary Sewer Rehabilitation Project
The Department of Public Utilities-Water will be rehabilitating sanitary sewer services along the DuPage River under the bike path.
 
South Downtown Traffic Management Study
The City of Naperville has initiated a traffic management study to evaluate options for improving traffic flow and pedestrian connectivity along the southern perimeter of the Downtown Area.
 
Water Street TIF District
The Water Street TIF study was initiated to explore options to finance expenses associated with a mixed use redevelopment proposal consistent with that anticipated by the Water Street Vision Statement.
 
West Street with Emerald Drive and Osler Drive
The City of Naperville is conducting a feasibility study to evaluate the installation of a traffic signal at the intersection of West Street with Emerald Drive.