Current city projects are projects that the city is working on that are in some stage of design phase and possibly even the beginning of construction. The Web sites are not updated as frequently, as the design process from beginning to being ready for construction can take anywhere from two to 10 years, and sometimes more. This can include any of the following stages of design: preliminary design, final design, land acquisition, bidding of the plans and beginning coordination of construction activities.

Click here for a list of Construction Alerts.


5th Avenue Study Implementation
Adopted by the Naperville City Council on December 1, 2009, the 5th Avenue Study is a long-range plan with implementation expected to occur over the next 20 to 30 years.
 
95th Street Bridge Extension Project
The 95th Street Extension project will extend 95th Street over the DuPage River, completing a direct connection between Plainfield-Naperville Road and Boughton Road.  The Will County Department of Highways is leading this project with support from the City of Naperville and the Village of Bolingbrook.
 
95th Street Watermain Project
Watermain infrastructure construction work is scheduled to take place on 95th Street between Ashbury Drive and Gateshead Drive beginning the week of August 2.
 
Accessible Pedestrian Signals
In late 2008, Accessible Pedestrian Signals were installed at the intersection of Chicago Avenue and Ellsworth Street, near the North Central College campus.
 
Bicycle Implementation Plan
The City of Naperville Bicycle Implementation Plan guides the establishment of new bicycle facilities throughout the city.
 
Circulator Transit Study
The purpose of the Naperville Circulator Study is to examine the potential for the successful implementation of a local transit service within the City of Naperville.
 
Downtown Parking Initiatives
The Downtown Parking Initiatives will review site and financing options for the construction of additional parking in the downtown area.
 
Downtown Parking Management Study
A study is being conducted to examine all opportunities that could lead to traffic and parking system improvements in the downtown to meet the needs of all users.
 
East Sector Comprehensive Plan Update
The East Sector is Naperville’s largest planning area, encompassing over 27 square miles of land. Although most of the East Sector will retain its established character into the future, some areas may be subject to future development or redevelopment. 
 
Illinois Route 59: Expansion
A study was commissioned in 2003 to analyze the current traffic situation, consider various options to enhance safety and improve traffic flow and design a safe and cost-effective plan to address these issues for Route 59 along the western border of Naperville.
 
Naperville Downtown2030
The City of Naperville is updating its Downtown Plan to define what additional steps are necessary to ensure Naperville remains a special place through 2030 and beyond.
 
Naperville Metra Station Bus Depot and Commuter Access Feasibility Study
As an implementation action item from the 5th Avenue Study, the City of Naperville will evaluate the feasibility of a bus depot in the vicinity of the Naperville Metra Station.
 
North Aurora Road Improvement
The purpose of this project is to conduct a preliminary engineering study for widening North Aurora Road from Frontenac Road to Weston Ridge Drive from three lanes to five lanes.
 
North Aurora Road Underpass
The purpose of this project is to conduct a preliminary engineering study for the widening and replacement of the North Aurora Road Underpass at the Elgin, Joliet, & Eastern (EJ&E)/ Burlington Northern Santa Fe Railroad (BNSF) railroad tracks.
 
Ogden Avenue Corridor Enhancement Initiative
The City of Naperville, in cooperation with the Naperville Development Partnership, is conducting a study for the possible enhancement of Ogden Avenue between Washington Street and Naper Boulevard.
 
Ranchview Drive Electric Utility Infrastructure
Ranchview Drive Electric Utility Infrastructure Work to Begin in SpringConstruction related electrical infrastructure work in scheduled to take place on Ranchview Drive between Wehrli Road and 75th Street beginning the week of
 
Riverwalk Rehabilitation Project
Riverwalk Rehabiliation Project will help maintain the stability, hospitality and appearance of Naperville’s “crown jewel” for future generations to come.
 
Sanitary Sewer Manhole Rehab Project
The City of Naperville Dept. of Public Utilities-Water has contracted Red Horse Inc. to rehabilitate approximately 35 sanitary sewer manholes in the Iroquois St.-Washington St. area and Downtown along Webster St. and Jackson Ave.
 
Stormwater Inventory Collection
The City of Naperville has contracted with Woolpert, Inc. to verify/collect stormwater inventory data in 3 areas of the city beginning the week of October 11, 2010.
 
Water Street TIF District