Search
 

Driveway Permit

The building permit application must include three (3) copies of the full legal plat of survey, a list of material components, elevations, locations and dimensions of the proposed driveway. If the materials being installed include brick pavers, stamped, colored or exposed aggregate concrete or stamped asphalt in the driveway apron, a Driveway Covenant (PDF 84 KB)must be included with the Driveway Permit Application (PDF 234 KB).

**Concrete materials in the Driveway Apron can only be installed from April 15 through November 15**

Questions about a Driveway Permit?
In keeping with the city’s mission to provide Great Service, All the Time, the City of Naperville’s Inspection Team is available to answer your questions and review your plans on a one-on-one basis.

If all requirements are met during the review, the inspectors will issue permits on the spot. The service reduces the time between plan submittal and issue of the permit for construction. 

Inspectors are available every Wednesday and Thursday from 8 a.m. to noon at the first floor customer service counter of the Transportation, Engineering and Development Business Group, located in the Municipal Center at 400 S. Eagle Street. For questions related to this service, please contact the Inspection Services Team at (630) 420-6073.