CIP# CS006
On this Page... 2012 Annual Sidewalk Program Illinois Safe Routes to School Program Future Sidewalk Gap Installations Public Comment Period Project Background
Last Updated - February 2, 2012
2012 Annual New Sidewalk Program
In August 2011, the City Council approved the Program A and Program B sidewalk locations for the 2012 Annual New Sidewalk Program (see table below).
In advance of the City Council’s review of the FY12-13 budget, the sidewalk locations identified as Program A and Program B (below) were reviewed and approved by the City Council, subject to funding for the 2012 Annual New Sidewalk Program. The City Council will consider the budget for the 2012 Annual New Sidewalk Program at the Capital Improvements Program (CIP) Workshop in early 2012. More information on the city’s budget for the 2012 Annual New Sidewalk Program and the anticipated construction schedule will be posted to this webpage as it becomes available.
| No. |
Street Name |
Side of Street |
Gap Segment |
Location |
| Program A |
| 1. |
Ewing St. |
West |
Van Buren Av. Benton Av. |
Laird Woods |
| 2. |
Willow Rd. |
East |
Maple Ln. to Hillside Rd. |
East Highlands |
| 3. |
Wright St. |
East |
Hillside Rd. to Prairie Av. |
East Highlands |
| 4. |
13th Av. |
South |
Eagle St. to Washington St. |
Naperville Heights |
| 5. |
Main St. |
East |
14th Av. to 12th Av. |
Naperville Heights |
| 6. |
Main St. |
East |
14th Ave. to Dead End |
Naperville Heights |
| 7. |
Burlington Av. |
South |
East Av. to east of East Av. |
Other Non-Arterial |
| 8. |
East Av. |
East |
Burlington Av. to Murdstone Dr. |
Other Non-Arterial |
| 9. |
Book Rd. |
East |
South of Clearwater Ln. to 111th St. |
Arterial |
| Program B |
1.
|
West St.
|
West
|
Benton Av. to Douglas Av.
|
Laird Woods
|
2.
|
Ewing St.
|
West
|
Spring Av. to Douglas Av. alley
|
Laird Woods
|
3.
|
Ewing St.
|
West
|
Franklin Av. to Douglas Av.
|
Laird Woods
|
4.
|
Willow Rd.
|
East
|
Maple Ln. to Santa Maria Dr.
|
East Highlands
|
| 5. |
Maple Ln. |
South |
Melody Ln. to Sunset Dr. |
East Highlands |
6.
|
Webster St.
|
West
|
14th Av. to 13th Av.
|
Naperville Heights
|
7.
|
Webster St.
|
West
|
13th Av. to 12th Av.
|
Naperville Heights
|
8.
|
Webster St.
|
West
|
12th Av. to 11th Av.
|
Naperville Heights
|
9.
|
10th Av.
|
South
|
Eagle St. to Washington St.
|
Naperville Heights
|
10.
|
Eagle St.
|
East
|
Franklin Av. to Douglas Av.
|
Other Non-Arterial
|
11.
|
Franklin Av.
|
North
|
Julian St. to Columbia St.
|
Other Non-Arterial
|
12.
|
Porter Av.
|
South
|
Webster St. Main St.
|
Other Non-Arterial
|
13.
|
Naperville-Wheaton Rd. |
East |
Ogden Av. to Naperville Rd. |
Arterial |
These locations were selected based on the opportunity to provide for enhanced mobility and safety as follows:
- Proximity to a School
- Connectivity to the Sidewalk Network
- Safe Walk Route (no existing parallel route available)
The total length of the improvements is approximately 8,100 linear feet (1.5 miles). Construction would occur in summer 2012.
Illinois Safe Routes to School (SRTS) Program
The Safe Routes to School Program supports projects and programs that enable walking and bicycling to and from school. The City of Naperville applied to the program and is eligible to receive up to $250,000 for installation of sidewalk along school walk routes. The Safe Routes to School Program provides 100% project funding; no local match is required.
The announcement of the recipients of the SRTS Program funding is expected in early 2012 . In the event the city is selected for the SRTS Program, the funds will be used to cover a portion of the total cost of the 2012 Annual New Sidewalk Program ($300,000). The SRTS Program funds would be allocated to the installation of sidewalk in Naperville Heights and East Highlands, the neighborhoods with the highest concentration of sidewalk gaps. Updates regarding the city’s application for SRTS Program funding will be posted to this webpage as they become available.
Future Sidewalk Gap Installations
The following sidewalk gaps have been identified as the next priorities for installation through future construction programs. These locations will be further evaluated to develop the 2013 Annual New Sidewalk Program.
| No. |
Street Name |
Side of Street |
Gap Segment |
Location |
| 1. |
West St. |
West |
Douglas Av. to Spring Av. |
Laird Woods |
| 2. |
Cottage Av. |
South |
Fremont St. to West St. |
Laird Woods |
| 3. |
Sleight St. |
West |
Loomis St. to Hillside Rd. |
East Highlands |
| 4. |
Wellner Rd. |
West |
Loomis St. to Sleight St. |
East Highlands |
| 5. |
Wehrli Dr. |
West |
Hillside Rd. to Wright St. |
East Highlands |
| 6. |
View Ct. |
North |
Wellner Rd. to Wehrli Dr. |
East Highlands |
| 7. |
Melody Ln. |
East |
Hillside Rd. to Maple Ln. |
East Highlands |
| 8. |
Webster St. |
West |
11th Av. to Ogden Av. |
Naperville Heights |
| 9. |
Plainfield-Naperville Rd. |
West |
Oswego Rd. to Buttonwood Cr. |
Other Non-Arterial |
| 10. |
Hillside Rd. |
South |
Webster St. to Knoch Park |
Other Non-Arterial |
| 11. |
River Rd. |
East |
Aurora Av. to Oswego Rd. |
Other Non-Arterial |
| 12. |
Worthing Dr. |
North |
Washington St. to 2347 Worthing Dr. |
Other Non-Arterial |
| 13. |
Highland Av. |
North |
Wright St. to Columbia St. |
Other Non-Arterial |
| 14. |
Aurora Av. |
South |
River Rd. to Wild Cherry Rd. |
Arterial |
| 15. |
Washington St. |
East |
Gartner Rd. to Pioneer Park |
Arterial |
A map of the 2012 Annual New Sidewalk Program and sidewalk gaps identified as the next priorities for future construction programs is provided below:
Project Background
On January 6, 2004, City Council approved the Comprehensive Sidewalk Policy, a policy and guideline for sidewalk installations and maintenance within Naperville’s corporate boundaries. The policy assists City Council, the Transportation Advisory Board (TAB), staff and residents by clearly defining the city’s policies and practices for sidewalk installations.
The policy established the Annual New Sidewalk Program to programmatically install sidewalk in identified gap locations. Each year, a list of selected gap locations is presented to TAB and City Council for inclusion in the following year’s construction program. Since 2004, sidewalk has been installed in 68 gap locations, totaling approximately 10.2 miles.
Based on an inventory of existing sidewalk gaps throughout the city, the following gaps remain uninstalled and planned for future construction programs.
| |
Number of Sidewalk Gaps
|
Total Length of Sidewalk Gaps (Approx.)
|
Arterial Roadways
|
59
|
24 miles
|
Non-Arterial Roadways
|
309
|
40 miles
|
Total
|
368
|
64 miles
|
The approximately 64 miles of sidewalk gaps will be installed incrementally based upon the annual budget allocation for the new sidewalk program and a priority system. The priority system phases installation of sidewalk based on public safety, proximity to schools, linkages to the existing pedestrian network, roadway classification, project coordination opportunities, and public input.
On December 21, 2010, the City Council approved the 2011 Annual New Sidewalk Program as follows. These sidewalk gap segments were installed in summer 2011.
No.
|
Location
|
Street Name
|
Side of Street
|
Gap Segment
|
1.
|
Naperville Heights
|
Bauer Rd.
|
North
|
Mill St. to west of Apache Dr.
|
2.
|
Naperville Heights
|
12th Ave.
|
South
|
Washington St. to Eagle St.
|
3.
|
Naperville Heights
|
14th Ave.
|
North
|
Washington St. to Eagle St.
|
4.
|
Naperville Heights
|
Main St.
|
East
|
11th Ave. to 12th Ave.
|
5.
|
East Highlands
|
Sunset Dr.
|
South
|
Santa Maria Dr. to Loomis St.
|
6.
|
East Highlands
|
Sunset Dr.
|
West
|
Maple Ln. to Santa Maria Dr.
|
7.
|
Laird Woods
|
West St.
|
East
|
Franklin Ave. to Douglas Ave.
|
8.
|
Laird Woods
|
Ewing St.
|
West
|
Benton Ave. to Franklin Ave.
|
9.
|
Other Non-Arterial Roadways
|
Knoch Knolls Rd.
|
South
|
Seiler Dr. to Bluestem Ct.
|
10.
|
Other Non-Arterial Roadways
|
Frontenac Rd.
|
East
|
Prairie Path to just south of Diehl Rd.
|
|