2012 New Sidewalk Program
CIP# CS006

On this Page...
2012 Annual Sidewalk Program
Illinois Safe Routes to School Program
Future Sidewalk Gap Installations
Public Comment Period
Project Background 


Last Updated - February 2, 2012

2012 Annual New Sidewalk Program

In August 2011, the City Council approved the Program A and Program B sidewalk locations for the 2012 Annual New Sidewalk Program (see table below). 

In advance of the City Council’s review of the FY12-13 budget, the sidewalk locations identified as Program A and Program B (below) were reviewed and approved by the City Council, subject to funding for the 2012 Annual New Sidewalk Program.  The City Council will consider the budget for the 2012 Annual New Sidewalk Program at the Capital Improvements Program (CIP) Workshop in early 2012.  More information on the city’s budget for the 2012 Annual New Sidewalk Program and the anticipated construction schedule will be posted to this webpage as it becomes available.

No. Street Name Side of Street Gap Segment Location 
Program A  
1. Ewing St. West Van Buren Av. Benton Av. Laird Woods
2. Willow Rd. East Maple Ln. to Hillside Rd. East Highlands
3. Wright St. East Hillside Rd. to Prairie Av. East Highlands
4. 13th Av. South Eagle St. to Washington St. Naperville Heights
5. Main St. East 14th Av. to 12th Av. Naperville Heights
6. Main St. East 14th Ave. to Dead End Naperville Heights
7. Burlington Av. South East Av. to east of East Av. Other Non-Arterial
8. East Av. East Burlington Av. to Murdstone Dr. Other Non-Arterial
9. Book Rd. East South of Clearwater Ln. to 111th St.  Arterial
Program B 

1.

West St.

West

Benton Av. to Douglas Av.

Laird Woods 

2.

Ewing St. 

West

Spring Av. to Douglas Av. alley 

Laird Woods 

3.

Ewing St. 

West 

Franklin Av. to Douglas Av. 

Laird Woods 

4. 

Willow Rd. 

East 

Maple Ln. to Santa Maria Dr.

East Highlands 

5. Maple Ln. South Melody Ln. to Sunset Dr. East Highlands

6. 

Webster St. 

West 

14th Av. to 13th Av. 

Naperville Heights 

7. 

Webster St. 

West 

13th Av. to 12th Av. 

Naperville Heights 

8. 

Webster St. 

West 

12th Av. to 11th Av. 

Naperville Heights 

9. 

10th Av. 

South 

Eagle St. to Washington St. 

Naperville Heights 

10. 

Eagle St. 

East 

Franklin Av. to Douglas Av. 

Other Non-Arterial 

11. 

Franklin Av. 

North 

Julian St. to Columbia St. 

Other Non-Arterial 

12. 

Porter Av. 

South 

Webster St. Main St. 

Other Non-Arterial 

13. 

Naperville-Wheaton Rd.  East  Ogden Av. to Naperville Rd.  Arterial 

These locations were selected based on the opportunity to provide for enhanced mobility and safety as follows:

  • Proximity to a School
  • Connectivity to the Sidewalk Network
  • Safe Walk Route (no existing parallel route available)

The total length of the improvements is approximately 8,100 linear feet (1.5 miles).  Construction would occur in summer 2012.


Illinois Safe Routes to School (SRTS) Program

The Safe Routes to School Program supports projects and programs that enable walking and bicycling to and from school. The City of Naperville applied to the program and is eligible to receive up to $250,000 for installation of sidewalk along school walk routes. The Safe Routes to School Program provides 100% project funding; no local match is required.
 
The announcement of the recipients of the SRTS Program funding is expected in early 2012 .  In the event the city is selected for the SRTS Program, the funds will be used to cover a portion of the total cost of the 2012 Annual New Sidewalk Program ($300,000).  The SRTS Program funds would be allocated to the installation of sidewalk in Naperville Heights and East Highlands, the neighborhoods with the highest concentration of sidewalk gaps.  Updates regarding the city’s application for SRTS Program funding will be posted to this webpage as they become available.
 


Future Sidewalk Gap Installations

The following sidewalk gaps have been identified as the next priorities for installation through future construction programs.  These locations will be further evaluated to develop the 2013 Annual New Sidewalk Program. 

No. Street Name Side of Street Gap Segment Location 
1. West St. West Douglas Av. to Spring Av. Laird Woods
2. Cottage Av. South Fremont St. to West St. Laird Woods
3. Sleight St. West Loomis St. to Hillside Rd. East Highlands
4. Wellner Rd. West Loomis St. to Sleight St. East Highlands
5. Wehrli Dr. West Hillside Rd. to Wright St. East Highlands
6. View Ct. North Wellner Rd. to Wehrli Dr. East Highlands
7.  Melody Ln. East Hillside Rd. to Maple Ln. East Highlands
8. Webster St. West 11th Av. to Ogden Av. Naperville Heights
9. Plainfield-Naperville Rd. West Oswego Rd. to Buttonwood Cr. Other Non-Arterial
10. Hillside Rd.  South  Webster St. to Knoch Park Other Non-Arterial
11. River Rd.  East  Aurora Av. to Oswego Rd.  Other Non-Arterial
12.  Worthing Dr.  North  Washington St. to 2347 Worthing Dr.  Other Non-Arterial
13.  Highland Av.  North  Wright St. to Columbia St.  Other Non-Arterial 
14.  Aurora Av.  South  River Rd. to Wild Cherry Rd.  Arterial
15.  Washington St.  East  Gartner Rd. to Pioneer Park  Arterial 

A map of the 2012 Annual New Sidewalk Program and sidewalk gaps identified as the next priorities for future construction programs is provided below:


Project Background

On January 6, 2004, City Council approved the Comprehensive Sidewalk Policy, a policy and guideline for sidewalk installations and maintenance within Naperville’s corporate boundaries.  The policy assists City Council, the Transportation Advisory Board (TAB), staff and residents by clearly defining the city’s policies and practices for sidewalk installations.

The policy established the Annual New Sidewalk Program to programmatically install sidewalk in identified gap locations.  Each year, a list of selected gap locations is presented to TAB and City Council for inclusion in the following year’s construction program.  Since 2004, sidewalk has been installed in 68 gap locations, totaling approximately 10.2 miles.

Based on an inventory of existing sidewalk gaps throughout the city, the following gaps remain uninstalled and planned for future construction programs.

                                   

Number of Sidewalk Gaps

Total Length of Sidewalk Gaps (Approx.)

Arterial Roadways

59

24 miles

Non-Arterial Roadways

309

40 miles

Total

368

64 miles

The approximately 64 miles of sidewalk gaps will be installed incrementally based upon the annual budget allocation for the new sidewalk program and a priority system.  The priority system phases installation of sidewalk based on public safety, proximity to schools, linkages to the existing pedestrian network, roadway classification, project coordination opportunities, and public input.

On December 21, 2010, the City Council approved the 2011 Annual New Sidewalk Program as follows.  These sidewalk gap segments were installed in summer 2011. 

No.

Location

Street Name

Side of Street

Gap Segment

1.

Naperville Heights

Bauer Rd.

North

Mill St. to west of Apache Dr.

2.

Naperville Heights

12th Ave.

South

Washington St. to Eagle St.

3.

Naperville Heights

14th Ave.

North

Washington St. to Eagle St.

4.

Naperville Heights

Main St.

East

11th Ave. to 12th Ave.

5.

East Highlands

Sunset Dr.

South

Santa Maria Dr. to Loomis St.

6.

East Highlands

Sunset Dr.

West

Maple Ln. to Santa Maria Dr.

7.

Laird Woods

West St.

East

Franklin Ave. to Douglas Ave.

8.

Laird Woods

Ewing St.

West

Benton Ave. to Franklin Ave.

9.

Other Non-Arterial Roadways

Knoch Knolls Rd.

South

Seiler Dr. to Bluestem Ct.

10.

Other Non-Arterial Roadways

Frontenac Rd.

East

Prairie Path to just south of Diehl Rd.