1. Building Permit

  2. Residential Load Calculation

  3. Solar Compliance Form

  4. Electrical Permit

  5. Are you in the Historic District?

Solar Panel Guidelines

3. Solar Compliance Form

The homeowner/contractor must submit a solar compliance form with the building permit application. This informs the Electric Utility about what type of system is being installed and that it meets industry standards and is a subset of the net metering guidelines. The system must be owned by the property owner, no PPA.