1. Electrical Permit and Net Metering Standards

  2. Solar Compliance Form

  3. Residential Load Calculation

  4. Are you in the Historic District?

Solar Panel Guidelines

1. Electrical Permit and Net Metering Standards

An electrical permit is required prior to beginning any electrical work within the City of Naperville's boundaries. In addition, the electrical contractor must be registered with the City of Naperville. All electrical installations must be performed by a state-licensed electrical contractor and must comply with the 2006 International Electrical Code and the 2005 National Electric Code (NEC). Here are the net metering standards for renewable energy installations.